Ecoinformatics site parent site of Partnership for Biodiversity Informatics site parent site of REAP - Home


 

 

 



Site Logs

Difference between version 8 and version 3:

Line 6 was replaced by line 6
- Conducted experiments to 1) ensure we know the physical location of each light sensor and 2) try to determine why qsosun is tracking but began reporting lower than ground level values around 14:30 2008-05-30.\\
+ Conducted experiments to 1) ensure we know the physical location of each light sensor and 2) try to determine why qsosun is tracking but has been reporting lower than ground level values since 14:30 2008-05-30.\\
Line 9 was replaced by line 9
- 11:10-11:30PT - covered (blocked sun) linear light bar inside treated area (lower on the hill than met station)\\
+ 11:10-11:30PT - covered (blocked sun) from linear light bar inside treated area (lower on the hill than station)\\
Line 16 was replaced by line 16
- Site in ok shape. Rain gage funnel and filter-mesh found on ground nearby, difficulty clipping it back on securely. Some bird waste on solar panel cleaned off. qsosun looked clean, but was cleaned anyways as noted above. qsosun cable looked fine. Putty sealant on enclosure bottom around incoming cables is starting to flake off, future visitor should bring more. Enclosure desiccant should probably be replaced too.\\
+ Site in ok shape. Rain gage funnel and filter-mesh found on ground nearby, difficulty clipping it back on securely so was secured with duct tape in two places. Some bird waste on solar panel cleaned off. qsosun looked clean, but was cleaned anyways as noted above. qsosun cable looked fine. Putty sealant on enclosure bottom around incoming cables is starting to flake off, future visitor should bring more. Enclosure desiccant should probably be replaced too. Screw in lightening rod clamp is rusting.\\

Back to Site Logs, or to the Page History.